Plans for Proposed Local Agency Improvement

90% Drawings

  • Special Provisionsopens PDF file
  • Vol 1
    • Part 1opens PDF file –Title Page, Index of Sheets, General Notes, Construction Items, Typical Sections Roadway Schedule
    • Part opens PDF file 2opens PDF file — Roadway Schedule (con’t), Alignments Ties and Benchmarks, Key Plan, Roadway Removal Plan, Roadway Plan
    • Part 3opens PDF file — Roadway Plan (con’t), Roadway Profile, Intersection Grading and Jointing Details, ADA Ramp Details
    • Part 4opens PDF file — ADA Ramp Details (con’t), Entrance Details, Roadway Details, Building Demolition Key Plan, Suggested Stages of Construction and Traffic Control Schedule, Suggested Stages of Construction and Traffic Control Narrative, Suggested Stages of Construction and Traffic Control Typical Sections
    • Part 5opens PDF file — Suggested Stages of Construction and Traffic Control Typical Sections (cont’t)
    • Part 6opens PDF file — Suggested Stages of Construction and Traffic Control Plan, Detour Plan, Brush College Road, Temporary Erosion and Sedimentation Control Plan
    • Part 7opens PDF file — Temporary Erosion and Sedimentation Control Plan (con’t), Permanent Erosion and Sedimentation Control Plan, Brush College Existing Utility Plan, Faries Parkway Existing Utility Plan
    • Part 8opens PDF file — Existing Utility Plan, Brush College Road Drainage Schedule, Existing Drainage Removal Plan, Proposed Drainage Plan
    • Part 9opens PDF file — Proposed Drainage Plan (con’t), Proposed Drainage Profiles Leftside, Proposed Drainage Profiles Rightside
    • Part 10opens PDF file — Proposed Drainage Profiles Rightside (con’t), Pipe Collar Details, Drainage Details Under Railroads, Temporary Soil Retention System, Drainage Details, Water Main Relocation Plan and Sanitary Sewer Adjustments, Pavement Marking & Signing Schedules
    • Part 11opens PDF file — Pavement Marking & Signing Plan (con’t), Pavement Marking & Signing – Sign Panels
  • Vol 2

 

60% Drawings

30% Drawings